Mission involves 11 interventions through existing schemes; aims to build 4.9 lakh pucca homes, lay 8,000 km of connecting roads, and bring piped water to all households in 22,000 PVTG villages
©2024 SAIWEBS WordPress Theme by WPEnjoy
Mission involves 11 interventions through existing schemes; aims to build 4.9 lakh pucca homes, lay 8,000 km of connecting roads, and bring piped water to all households in 22,000 PVTG villages